Uploads by S173562
Jump to navigation
Jump to search
This special page shows all uploaded files.
| Date | Name | Thumbnail | Size | Description | Versions |
|---|---|---|---|---|---|
| 11:45, 26 February 2018 | Concurrent Engineering.jpg (file) | 84 KB | 3 | ||
| 10:37, 26 February 2018 | Integrated Design Process.jpg (file) | 52 KB | 1 | ||
| 09:12, 26 February 2018 | Change.jpg (file) | 50 KB | Impact of changes based on project time. Adapted from figure 2-9. (Project Management Institute, (2008). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fifth Edition. Publisher: Project Management Institute. Chapter 2.4.1) | 1 | |
| 08:38, 26 February 2018 | Cost Time.jpg (file) | 82 KB | Figure 1. Costs and staffing compared with project time. Adapted from figure 2.8 in (Project Management Institute, (2008). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fifth Edition. Publisher: Project Management Institute. Chap... | 1 | |
| 14:36, 15 February 2018 | Integrated Design Process.png (file) | 154 KB | Illustration of IDP. Source: http://task23.iea-shc.org/integrated-design-process | 1 |