Performance Reporting: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 7: | Line 7: | ||
! Area | ! Area | ||
! Role | ! Role | ||
! Reporting documents | |||
|- | |- | ||
! style="width: 200px;" |Scope (or Configuration) Management | ! style="width: 200px;" |Scope (or Configuration) Management | ||
| style="width: | | style="width: 500px;" |The scope of work defines what the project is producing or delivering. Reports will take track of scope variation during the implementation. | ||
| style="width: 200px;" | | |||
* Project Communication | |||
* Impact statements | |||
* Variations and Modifications | |||
* Change requests | |||
* Concessions | |||
* Closeout report | |||
|- | |||
! Technical Support | |||
| Technical experts keeps track of their results to interpret clients need and addressing it respecting regulation and adopting good practices. | |||
|- | |||
! Time Management | |||
| Outlines the sequence and timing of the scope of work through control documents as Progress report | |||
|- | |||
! Technical Support | |||
| Technical experts keeps track of their results to interpret clients need and addressing it respecting regulation and adopting good practices. | |||
|- | |- | ||
! Technical Support | ! Technical Support | ||
Revision as of 09:54, 13 September 2017
Project reporting is all the set of activities aimed to monitor the progress of different activities of a project. The state of each activity is defined by the evaluation of data representing the metrics chosen for the Report. The main outcome of a correct reporting system is to provide information about the state of a project. These information should be available in a time range that allows the project manager to eventually take effective corrective actions. [1]
Scope of Control
Different knowledge areas are involved as in planning, also in the control activities, these are:
| Area | Role | Reporting documents |
|---|---|---|
| Scope (or Configuration) Management | The scope of work defines what the project is producing or delivering. Reports will take track of scope variation during the implementation. |
|
| Technical Support | Technical experts keeps track of their results to interpret clients need and addressing it respecting regulation and adopting good practices. | |
| Time Management | Outlines the sequence and timing of the scope of work through control documents as Progress report | |
| Technical Support | Technical experts keeps track of their results to interpret clients need and addressing it respecting regulation and adopting good practices. | |
| Technical Support | Technical experts keeps track of their results to interpret clients need and addressing it respecting regulation and adopting good practices. |
Notes
- ↑ Project Management: Planning and Control Techniques, Third Edition, Wiley, Chichester, 1999, p. 191