Talk:Risk Profile in General Contracting: Difference between revisions
Jump to navigation
Jump to search
Created page with "KB1991, reviewer 2: * What there is written so far is good. * Good introduction that describes the topic briefly, but the last part has been written twice. * The structure l..." |
No edit summary |
||
| Line 4: | Line 4: | ||
* The structure looks fine both regards to the formatting and the red threat. | * The structure looks fine both regards to the formatting and the red threat. | ||
* Would have been nice to read more of the article ☺ | * Would have been nice to read more of the article ☺ | ||
s150905, Review 2: | |||
The idea behind this article seem really interesting, but most of the article itself is missing | |||
* The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work | |||
* The lack of text and imagines make impossible to me to do some actual consideration about the work | |||
Revision as of 14:41, 22 September 2015
KB1991, reviewer 2:
- What there is written so far is good.
- Good introduction that describes the topic briefly, but the last part has been written twice.
- The structure looks fine both regards to the formatting and the red threat.
- Would have been nice to read more of the article ☺
s150905, Review 2: The idea behind this article seem really interesting, but most of the article itself is missing
- The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
- The lack of text and imagines make impossible to me to do some actual consideration about the work