Talk:Risk Profile in General Contracting: Difference between revisions

From DTU ProjectLab
Jump to navigation Jump to search
S150905 (talk | contribs)
No edit summary
S150905 (talk | contribs)
No edit summary
Line 4: Line 4:
* The structure looks fine both regards to the formatting and the red threat.  
* The structure looks fine both regards to the formatting and the red threat.  
* Would have been nice to read more of the article ☺
* Would have been nice to read more of the article ☺


s150905, Review 2:
s150905, Review 2:
The idea behind this article seem really interesting, but most of the article itself is missing
The idea behind this article seem really interesting, but most of the article itself is missing
* The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
* The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
* The lack of text and imagines make impossible to me to do some actual consideration about the work
* The lack of text and imagines make impossible to me to do some actual consideration about the work

Revision as of 15:08, 22 September 2015

KB1991, reviewer 2:

  • What there is written so far is good.
  • Good introduction that describes the topic briefly, but the last part has been written twice.
  • The structure looks fine both regards to the formatting and the red threat.
  • Would have been nice to read more of the article ☺


s150905, Review 2:

The idea behind this article seem really interesting, but most of the article itself is missing

  • The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
  • The lack of text and imagines make impossible to me to do some actual consideration about the work