Talk:Risk Profile in General Contracting: Difference between revisions

From DTU ProjectLab
Jump to navigation Jump to search
KB1991 (talk | contribs)
Created page with "KB1991, reviewer 2: * What there is written so far is good. * Good introduction that describes the topic briefly, but the last part has been written twice. * The structure l..."
 
S150905 (talk | contribs)
No edit summary
Line 4: Line 4:
* The structure looks fine both regards to the formatting and the red threat.  
* The structure looks fine both regards to the formatting and the red threat.  
* Would have been nice to read more of the article ☺
* Would have been nice to read more of the article ☺
s150905, Review 2:
The idea behind this article seem really interesting, but most of the article itself is missing
* The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
* The lack of text and imagines make impossible to me to do some actual consideration about the work

Revision as of 14:41, 22 September 2015

KB1991, reviewer 2:

  • What there is written so far is good.
  • Good introduction that describes the topic briefly, but the last part has been written twice.
  • The structure looks fine both regards to the formatting and the red threat.
  • Would have been nice to read more of the article ☺

s150905, Review 2: The idea behind this article seem really interesting, but most of the article itself is missing

  • The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
  • The lack of text and imagines make impossible to me to do some actual consideration about the work