File:Wbs house.png
Jump to navigation
Jump to search
Size of this preview: 482 × 599 pixels. Other resolution: 552 × 686 pixels.
Original file (552 × 686 pixels, file size: 199 KB, MIME type: image/png)
Figure 6. Work Breakdown Structure of a House. http://www.workbreakdownstructure.com/100-percent-rule-work-breakdown-structure.php
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 22:28, 28 September 2015 | 552 × 686 (199 KB) | S141530 (talk | contribs) | Figure 6. Work Breakdown Structure of a House. http://www.workbreakdownstructure.com/100-percent-rule-work-breakdown-structure.php |
You cannot overwrite this file.
File usage
The following page uses this file: